Back
Sunrise and Big Lake: AZ-273 and 261, White Mountains, Arizona
Photo: Alan English CPA from Scottsdale, Arizona 85254, USA · CC BY-SA 2.0

Drives Arizona The Mogollon Rim and White Mountains

Sunrise and Big Lake: AZ-273 and 261

White Mountains, Arizona · AZ-260 junction → Eagar

Sweeping34 mi50 min1,600 ft climbHigh point ≈ 9,400 ftOne way
Scan to drive it in CarvePoint a phone's camera here. It opens ready to drive.
Drive it in Carve, free

Opens this route in the app, or where to get it.

The drive

This drive crosses the high White Mountains on two state routes. AZ 273 heads south from the AZ 260 junction past the turnoff to Sunrise Park Resort, across high meadows and spruce forest near 9,000 feet, toward Big Lake. At the AZ 261 junction the route turns north, passing Crescent Lake and descending to Round Valley and the town of Eagar.

Big Lake itself is a spur south of the junction, left off so the drive doesn't double back. The curves are mostly gentle, with one twisty stretch on the way down toward Eagar. The high country is cool even in summer, and aspens turn in fall.

Along the way

  1. AZ-260 junction
  2. Sunrise Park Resort turnoff
  3. Crescent Lake
  4. Eagar (AZ-260)
Elevation
1,600 ft of climbing · high point ≈ 9,400 ft
AZ-260 junctionEagar
Curves
Mostly gentle, with one twisty stretch
AZ-260 junctionEagar
GentleHairpins

Good to know

  • AZ 273 (Sunrise Park to Big Lake) and AZ 261 (Eagar to Big Lake) are closed in winter, starting December 31, and reopen in spring.
  • The road runs near 9,000 feet, so mornings are cold and snow can arrive early or late.
  • There are few services on the high part of the route.

AZ-273 and AZ-261 close from December 31 to about mid-April. Roads close for snow, fire, storms and repairs: before you set off, check Arizona 511 (ADOT).

Questions about this drive

Is AZ 273 and 261 open in winter?

No. ADOT closes AZ 273 from Sunrise Park to Big Lake and AZ 261 from Eagar to Big Lake from December 31 until spring, usually around mid-April.

How long does the Sunrise and Big Lake drive take?

The route from the AZ 260 junction to Eagar is 34.1 miles and takes about 50 minutes.

Does this drive go to Big Lake?

No. Big Lake is a short spur south of the AZ 261 junction, and this route turns north there toward Eagar.

What you get in the app

Turn by turn, on this roadSpoken directions along the exact route. Carve never reroutes you onto a faster one.
Preview it in 3DFly the whole drive over satellite and terrain before you go.
Drive it with no signalAPEXDownload the map and every turn before you go.
Live Group TrackingAPEXEveryone on the route, on the map, by name.
Road conditionsAPEXWet or dry, ice, fog and wind along the road before you go.
Record your drivesAPEXRecord a drive and turn it into a route to drive again or share.

Free on iPhone and Android. CarPlay and Android Auto come with Apex.

More drives near here

Distance, time, elevation, curves and intensity are from Carve's route. Checked 2026-10-28.

Map of Sunrise and Big Lake: AZ-273 and 261, from AZ-260 junction to Eagar