Back
Loveland Pass: US-6, Continental Divide, Colorado
Photo: Famartin · CC BY-SA 4.0 · cropped

Drives Colorado Summit County, Vail, Aspen and the High Country

Loveland Pass: US-6

US 6, Loveland Pass · Loveland Ski Area → Keystone

Twisty13.7 mi25 min1,400 ft climbHigh point ≈ 12,000 ftOne way
Scan to drive it in CarvePoint a phone's camera here. It opens ready to drive.
Drive it in Carve, free

Opens this route in the app, or where to get it.

The drive

Loveland Pass is US 6 over the Continental Divide, a highway that crosses above the Interstate 70 tunnels. The drive leaves the Loveland ski area at I-70, climbs west in hairpins to the pass at about 12,000 feet, and drops past Arapahoe Basin to Keystone.

Most of the tight turns come on the first six miles up from the interstate. At the top, the road is above treeline and the views open over the Continental Divide and Summit County. It's a short drive, 14 miles in about 25 minutes, but the climb is steep and the road has little room.

Along the way

  1. Loveland Ski Area (I-70)
  2. Loveland Pass
  3. Arapahoe Basin
  4. Keystone
Elevation
1,400 ft of climbing · high point ≈ 12,000 ft
Loveland Ski AreaKeystone
Curves
Mostly moderate, with two twisty stretches
Loveland Ski AreaKeystone
GentleHairpins

Good to know

  • Trucks carrying hazardous materials can't use the Eisenhower Tunnel, so they are sent over the pass. Expect to share tight curves with tankers.
  • CDOT describes the pass as having tight switchbacks and steep grades, and it often closes for snow and avalanche danger. Check COtrip in winter.
  • Landslides and work have closed the pass for long stretches before, so check for work or closures before you go.

Open all year, weather permitting. Roads close for snow, fire, storms and repairs: before you set off, check CDOT COtrip.

Questions about this drive

How long does Loveland Pass take to drive?

Loveland ski area to Keystone on US 6 is 14 miles and takes about 25 min.

Is Loveland Pass open in winter?

Yes, US 6 over Loveland Pass is plowed all year, but it often closes during storms or for avalanche danger.

Why do trucks drive over Loveland Pass?

Hazardous-materials trucks aren't allowed through the Eisenhower Tunnel on I-70, so they are routed over Loveland Pass on US 6.

How twisty is Loveland Pass?

Loveland Pass is rated Twisty, with hairpins on the climb from I-70 and a long, open descent toward Keystone.

What you get in the app

Turn by turn, on this roadSpoken directions along the exact route. Carve never reroutes you onto a faster one.
Preview it in 3DFly the whole drive over satellite and terrain before you go.
Drive it with no signalAPEXDownload the map and every turn before you go.
Live Group TrackingAPEXEveryone on the route, on the map, by name.
Road conditionsAPEXWet or dry, ice, fog and wind along the road before you go.
Record your drivesAPEXRecord a drive and turn it into a route to drive again or share.

Free on iPhone and Android. CarPlay and Android Auto come with Apex.

More drives near here

Distance, time, elevation, curves and intensity are from Carve's route. Checked 2026-10-28.

Map of Loveland Pass: US-6, from Loveland Ski Area to Keystone